Now moored at Stourbridge no designated visitor moorings a wasted opportunity, so we are moored just before the water point. We plan to stay 2 nights then move back onto Dudley we had hoped to go through Netherton Tunnel but it is closed for the winter major repairs needed so we will have to retrace our route back to Staffs & Worcs. I am attempting to work out what I need from Wickes / Screwfix to connect the wood burner back boiler to the radiators may as well spread the heat to the back of the boat.It's a
mixture of compression copper and plastic pushfit connections.
No comments:
Post a Comment